Suratgarh Super Thermal Power Station Full Report

For Full report click on the link mentioned above...


Sample

TABLE OF CONTENT
• ABSTRACT
• INTRODUCTION
• SELECTION OF SITE
• PLANT FAMILIRIZATION
• TURBINE
• GENERATOR
• COAL HANDLING
• BOILER
• CONDENSOR
• EVAPORATOR
• COOLING TOWER
• TURBO ALTERNATOR
• FUEL HANDLING
• ASH HANDLING
• STEAM POWER PLANT CONTROLS
• THERMAL POWER PLANT AUXILIARIES
• EFFICIENCY
• TECHNOLOGIES
• TECHNICAL GAIN
• REFERANCE

ABSTRACT

The Suratgarh Super Critical Thermal Power Station is an electricity production project that is maintained by the Rajasthan Rajya Vidhyut Nigam Limited. It is Rajasthan’s foremost super thermal power station.
This station has been successful in controlling pollution and maintaining balance of atmospheric emissions in the environment. The Union Ministry of Power has awarded this power station with the Golden Shield Award.
The resinous project of Rajasthan, the Super Thermal Power Station, and Suratgarh is situated near village Thukrana about 27 km. from Suratgarh city in Sriganganagar district. The site was considered an ideal location for setting up a thermal power station due to availability of land, water, transmission line and cheap labour. Suratgarh Super Thermal Power Station has reached such dizzying heights of success that its sixth unit. In this unit, maximum capacity on coal firing was attained in less than 10 hours and the phenomenal completion of the project in less than two years is a ground breaking achievement for the nation. Besides the philanthropic organization also has a social conscience. The organization plants nearly 3.5 Lakhs saplings every year, digs up dykes and water bodies and monitors the effusion of effluent materials and ambient air quality in order to check the pollution level.

INTRODUCTION

Suratgarh Super Thermal Power Station
STPS is situated near village Thukrana about 27Km south east of Suratgarh town is Shri Ganaganager Distt. Suratgarh was considered an ideal location for setting up a thermal power station in the state having regards to the availability of land, water, transmission network proximity to broad gauge railway and being an important load centre for north-west Rajasthan. Water and coal required in a large amount. Coal is received here from coal-fields of MP areas through railways and water requirement will be 121.824 MLD and would be sourced from the INDIRA GANDHI CANAL through a pipeline at a distance of about 23 kms from the project. The supply of coal is from MP, Jharkhand by rail. About 18000 tonne coal required per day for whole unit and each unit consumes 150tonnes coal per day. About 2x3 km2 area covered by plant and approximately 1800 employees works in a plant including chief engineer to labour. The supply electricity to the northern Rajasthan, Ratangarh, Bikaner, Ganganagar.
Suratgarh super thermal power project is an existing 1500 MW coal based thermal power plant promoted and operated by Rajasthan Rajya Viduth Utpadan Nigam Ltd. at Shriganganagar in Rajasthan, India.
The four units of 660 MW have been proposed. The proposal is for expansion by addition of 2×660 MW Coal Based Thermal Power Plant at village Thukrana, in Suratgarh Tehsil, in Sri Ganganagar Distt., in Rajasthan.
The existing plants are of capacity 2×250 MW (Stage I) ; 2×250 MW (Stage II) ; 1×250 MW (Stage III) ;and 1×250 MW (Stage IV). Land requirement will be 400 hectares, which comprises of 338 ha single crop agricultural land; And 22 ha waste land. Out of total land required, about 360 ha will be used for main plant; And 40 ha will be used for township.
Coal requirement will be 6.5 MTPA and both will be domestic and imported. Domestic coal will be obtained from Parsa East & Kante Basan Coal Block for
which environmental clearance has been obtained on 21.12.2011. Domestic coal and imported coal will be blended in a ratio of 70:30 respectively.
Ash content in domestic coal will be 35% and imported coal will be 16%. About 1.5236 MTPA fly ash and 0.3809 bottom ash will be generated. Stack height will be 275m.
Cost of the project will be Rs 7920.00 Crores. (Include stage 5)
The techno-economic clearance for the prefect was issued by CEA in June1991. The planning commission accorded investment sanction for the project in Nov. 1991 for a total estimated cost of Rs. 1253.31 Crores on prices prevailing in Sept.1990. The updated cost of the project is estimates at Rs. 2300 Crores of including IDC.
 Unit 1st of STPS was commissioned on coal firing on 4.10.1998 and commercial operation of the unit was declared from 1.2.1999. The unit was dedicated to the Nation by Hon’ble Chief Minister of Rajasthan Shri Ashok Gehlot on 3.10.1999.
 The foundation stone for Unit 3rd and 4th STPS stage-II was laid by Hon’ble Chief Minister of Rajasthan Shri Ashok Gehlot on 3.10.1999.
 250MW Unit of STPS was commissioned on 28.3.2000 and was put on commercial operation from 16.7.2000. It saved Rs. 80 Crores due to early start of generation. The Unit was dedicated to the Nation by Hon’ble Dy. Leader of Opposition, Lok-Sabha Smt. Sonia Gandhi on 13.10.2000.
 The foundation stone 250MW Unit 5th under STPS stage-III was laid by Hon’ble Union Minister of Power Shri Suresh P.Prabhu on 12.2.2001.
 250MW Unit 3rd of STPS was commissioned on oil 29.10.2001 and was put on commercial from 15.1.2002. The unit was dedicated to the Nation by Hon’ble Dy. Leader of Opposition, LokSabha Shri ShivrajV.Patil on 17.3.2002.
 250MW Unit 4th of STPS was commissioned on oil 25.3.2002 and has been put on commercial operation from 31.7.2002. The unit was dedicated to the Nation by Hon’ble Leader of Opposition, Rajya Sabha Dr. Manmohan Singh on 10.8.2002. With the commissioning of Unit 4th of 250MW at STPS it became FRIST SUPER THERMAL POWER STATION OF RAJASTHAN.
 250MW Unit 5th & Unit 6thof STPS was commissioned on oil 25.3.2002 and has been put on commercial operation from 31.7.2002. The unit was dedicated to the Nation by Hon’ble Leader of Opposition, Rajya Sabha Dr. Manmohan Singh on 10.8.2002. With the commissioning of Unit 4th of 250MW at STPS it became FRIST SUPER CRITICAL THERMAL POWER STATION OF RAJASTHAN.

For Full report click on the link mentioned above...
note:kindly use vpn to download.

For Further Queries :-

Comments

Popular posts from this blog

ASHOK LEYLAND,ALWAR Full Report

Indian Railway Training Report,Jaipur

BOSCH Full report